Navigator »News »Detail


Update: Ramp Meters - Hours of Operation

Jul 23, 2009


Below is a schedule of operation for ramp meters in the Atlanta area. Ramp meters are programmed to come on only when the freeway traffic reaches a certain level, so the actual hours of operation may vary somewhat from day to day. Also, if lines on the ramp get too long, the meter may shut off temporarily to allow the traffic to flush out.

I-285 north side
I-285 east side
I-285 west side
I-85 in Gwinnett (also includes ramps at Chamblee Tucker and N Druid Hills)
I-75/85 Downtown Connector
I-75 North inside I-285
I-75 in Cobb County
I-75 south side (Clayton/Henry Co)
I-575 Cobb and Cherokee Co
I-285 Southwest side (Cascade, Camp Creek, etc)
I-20 west side (Holmes Dr, Lowery, McDaniel, etc)
I-20 east side (Candler, Flat Shoals, Moreland Ave, etc)
GA 400 north end (Old Milton to McFarland)
Again, the meters have been programmed to only come on when freeway traffic is "dense" enough to warrant turning on the meters. Therefore, it is possible that you may encounter a meter that is off during the above hours. If so, proceed down the ramp without stopping. Merge with usual caution.

Future ramp meter corridors with approx date of turn-on

For more information, please visit our Ramp Meter web page.


Navigator |  Maps |  Incidents |  Construction |  Traffic Cams |  Message Signs |  Trip Times